CLIENT: Stantec

LOCATION: Miami, Florida (USA)

KEY ELEMENTS: Bridge, Rehabilitation, Girder, Concrete, Vehicular

SERVICES: Inspection and Maintenance, Repair and Rehabilitation

BUDGET: -

PROJECT DURATION: 2015 - on going

PEDELTA’S KEY PERSONNEL: Juan A. Sobrino, PhD, PEng, PE

PROJECT DESCRIPTION

FDOT D6 project (FPID 436522-1-1-32-01) consisting of inspecting and designing the repairs for the existing MacArthur Causeway East Bridge (Bridge #870077). The bridge was built in 1957. It is 2,155 ft long and has 34 prestressed concrete girder approach spans, 15 of them being 45 ft long and the remaining 19 being 65 ft long, and 3 continuous steel girder main spans (10 ft + 105 ft + 70 ft). Pedelta has been retained by Stantec (prime consultant) to inspect and design the repairs of the bridge superstructure.

 

+ Features

CLIENT: Stantec

LOCATION: Miami, Florida (USA)

KEY ELEMENTS: Bridge, Rehabilitation, Girder, Concrete, Vehicular

SERVICES: Inspection and Maintenance, Repair and Rehabilitation

BUDGET: -

PROJECT DURATION: 2015 - on going

PEDELTA’S KEY PERSONNEL: Juan A. Sobrino, PhD, PEng, PE

+ Description

PROJECT DESCRIPTION

FDOT D6 project (FPID 436522-1-1-32-01) consisting of inspecting and designing the repairs for the existing MacArthur Causeway East Bridge (Bridge #870077). The bridge was built in 1957. It is 2,155 ft long and has 34 prestressed concrete girder approach spans, 15 of them being 45 ft long and the remaining 19 being 65 ft long, and 3 continuous steel girder main spans (10 ft + 105 ft + 70 ft). Pedelta has been retained by Stantec (prime consultant) to inspect and design the repairs of the bridge superstructure.