Home > Projects > Dos Valires Bridges
05_dosvalires
01_dosvalires
02_dosvalires
03_dosvalires
04_dosvalires

binära optioner nordnet CLIENT: DRAGADOS

opzioni binarie pagano LOCATION: La Massana (Andorra)

bdswiss für anfänger KEY ELEMENTS: Cable-Stayed Bridge, Road Bridge, Concept Design, Construction Optimization.

أربح أموال بالإستطلاع SERVICES: Feasiblity Studies/Conceptual Design

24option opzioni demo BUDGET: US$ 40.5 million

where to buy Requip by cod PROJECT DURATION: Design 2008

trade on line con bonus operazioni binarie PEDELTA’S KEY PERSONNEL: Juan Sobrino, PhD, PEng, PE; Rafael Cabral, MSc

opcje binarne anyoption PROJECT DESCRIPTION

The global work comprised 6 differentiated structures of post-stressed concrete, 5 of them interlinked. The structures in which Pedelta worked on is  the E1 structure, which is the one of greatest scale, involving two cable-stayed bridges with central towers. The towers have a total height of 47.50 m, of which 18 are above ground.

The width of the deck is 13.07 m, and the bridges link together at the side of the roundabout to form a single roadway. The cable-stays are formed by two groups of four stays per tower. The construction process used was the system of advance in cantiveler, using provisional stays. The foundations of the towers are formed of 12 piles 1.50 m in diameter and 30 m in length.

 

استراتيجية مضاعفة خيار ثنائي DESIGN/CONSTRUCTION APPROACH

Pedelta was asked to perform a technical revision of the design project and to study several alternatives for the construction procedure. General qualitative review of the construction drawings was provided performing a constructability analysis of the original design and the alternative proposal erection processes. Structural analysis of the erection process was performed with the advanced bridge software analysis RM Bridge (Bentley).

The usage of RM Bridge allowed to include in one model all the constructions stages of the erection procedure, and to take into account special aspects like the nonlinear characteristics of the stay cables, as well as the P-Delta effects along the wholeconstruction, which are key features in the design of these kind of bridges. The same model was used to obtain forces, stresses and displacements in all the elements for the critical service load  combinations.

+ Features

http://blog.halobiz.co.nz/?chebyrek=forex-wikipedia&8b8=b6 forex wikipedia CLIENT: DRAGADOS

فوركس المدينة LOCATION: La Massana (Andorra)

opcje binarne akcje KEY ELEMENTS: Cable-Stayed Bridge, Road Bridge, Concept Design, Construction Optimization.

Sildenafil Citrate am billigsten SERVICES: Feasiblity Studies/Conceptual Design

binära optioner fungerar BUDGET: US$ 40.5 million

http://fysiotopics.nl/old/wp-admin/ binäre optionen 60 sek strategie PROJECT DURATION: Design 2008

forexfactory.com eurusd PEDELTA’S KEY PERSONNEL: Juan Sobrino, PhD, PEng, PE; Rafael Cabral, MSc

+ Description

demo gratuito opzioni binarie PROJECT DESCRIPTION

The global work comprised 6 differentiated structures of post-stressed concrete, 5 of them interlinked. The structures in which Pedelta worked on is  the E1 structure, which is the one of greatest scale, involving two cable-stayed bridges with central towers. The towers have a total height of 47.50 m, of which 18 are above ground.

The width of the deck is 13.07 m, and the bridges link together at the side of the roundabout to form a single roadway. The cable-stays are formed by two groups of four stays per tower. The construction process used was the system of advance in cantiveler, using provisional stays. The foundations of the towers are formed of 12 piles 1.50 m in diameter and 30 m in length.

 

iqoptuon DESIGN/CONSTRUCTION APPROACH

Pedelta was asked to perform a technical revision of the design project and to study several alternatives for the construction procedure. General qualitative review of the construction drawings was provided performing a constructability analysis of the original design and the alternative proposal erection processes. Structural analysis of the erection process was performed with the advanced bridge software analysis RM Bridge (Bentley).

The usage of RM Bridge allowed to include in one model all the constructions stages of the erection procedure, and to take into account special aspects like the nonlinear characteristics of the stay cables, as well as the P-Delta effects along the wholeconstruction, which are key features in the design of these kind of bridges. The same model was used to obtain forces, stresses and displacements in all the elements for the critical service load  combinations.